Post-Tension Slab Anomaly
The Problem
Client experienced unexplained water pooling near the kitchen island. A previous contractor proposed blind jackhammering of the 2018 post-tension slab to locate the leak, risking catastrophic structural failure.
The Methodology
We deployed Ground Penetrating Radar (GPR) to map the tension cables. Secondary acoustic sonar pinpointed the exact fracture in a hot water manifold 8 inches below grade.
The Result
A surgical 2x2ft extraction was performed between tension cables. The line was repaired, and the structural vapor barrier was fully restored within 48 hours. Zero secondary damage occurred.